Meru Water Supply Project Phase I
Client | Ministry of Water Resources Management & Development |
---|---|
Contractor | Rural Distributors Enterprises Limited |
Start Year | 2009 |
End Year | 2010 |
Our scope included construction and civil works for.
- Excavation,
- Pipe laying,
- jointing (Butt welding Joint) & testing of epoxy coated steel pipeline 300mm to 200mm dia7,000m
- Excavation, laying, jointing & testing of Upvc 200mm to 20mm dia 51, 800m
- Construction of reinforced concrete water reservoir (885 cubic metres) with pipe room 1No
- High level water tank (150 m³) substructure 1No
- Construction of reinforced Concrete as follows:-
- Air valve chambers 22Nos
- Valve & tee junctions 28 Nos
- Fire hydrant chambers 1No
- Sludge chambers 5Nos
- Sluice valve chambers 29Nos
- Blow- off 54Nos
- Break pressure tanks 2Nos
- Flow meter chambers 5Nos