Meru Water Supply Project Phase I

ClientMinistry of Water Resources Management & Development
ContractorRural Distributors Enterprises Limited
Start Year2009
End Year2010

Our scope included construction and civil works for.

  1. Excavation,
  2. Pipe laying,
  3. jointing (Butt welding Joint) & testing of epoxy coated steel pipeline 300mm to 200mm dia7,000m
  4. Excavation, laying, jointing & testing of Upvc 200mm to 20mm dia 51, 800m
  5. Construction of reinforced concrete water reservoir (885 cubic metres) with pipe room 1No
  6. High level water tank (150 m³) substructure 1No
  7. Construction of reinforced Concrete as follows:-
  • Air valve chambers 22Nos
  • Valve & tee junctions 28 Nos
  • Fire hydrant chambers 1No
  • Sludge chambers 5Nos
  • Sluice valve chambers 29Nos
  • Blow- off 54Nos
  • Break pressure tanks 2Nos
  • Flow meter chambers 5Nos